Staging Level Return Loop with Serial Yard
Alternative staging approach - double track most of the length of the return loop. One track would be serial staging, the other could be kept clear for through running.
Clearances are generally the same, except that the inside (orange track) will be directly under the upper level spline for longer runs (which may make this less feasible).