This is a benchwork plan, but has an overlay of a stabilizing track plan for the area.
- Lowermost track is the lower level reversing loop. This no longer has a connection to an industrial area to the left
- The next line up is the "old" main that circles the mountain with minimal cuts and sharper curves. There will abandoned roadbed making a hard left turn from this track at the wall
- The dashed line above that is the "new" alignment. The railroad has decided to ease the curve by cutting a longer tunnel and building a new bridge to the left. Left of this the new right of way re-joins the abandoned right of way.
- The non-abandoned part of the old right or way (the middle line) will serve as a reversing loop and other things.