Thank you for your patience while we retrieve your images.
Uploaded 26-Nov-12
Taken 24-Nov-12
Visitors 240


9 of 22 photos
Photo Info

Dimensions3034 x 1340
Original file size2.36 MB
Image typeJPEG
Color spaceUnknown
Date taken24-Nov-12 20:01
Date modified24-Nov-12 22:30
Shooting Conditions

Camera makeApple
Camera modeliPhone 4S
Focal length4.28 mm
Focal length (35mm)35 mm
Exposure1/40 at f/2.4
FlashNot fired, auto mode
Exposure modeAuto
Exposure prog.Normal
ISO speedISO 64
Metering modePattern
Blob Benchwork Pan, final version

Blob Benchwork Pan, final version

This is a benchwork plan, but has an overlay of a stabilizing track plan for the area.

  • Lowermost track is the lower level reversing loop. This no longer has a connection to an industrial area to the left
  • The next line up is the "old" main that circles the mountain with minimal cuts and sharper curves. There will abandoned roadbed making a hard left turn from this track at the wall

  • The dashed line above that is the "new" alignment. The railroad has decided to ease the curve by cutting a longer tunnel and building a new bridge to the left. Left of this the new right of way re-joins the abandoned right of way.
  • The non-abandoned part of the old right or way (the middle line) will serve as a reversing loop and other things.